Tree removal permit rules: Bend vs Gresham, Oregon
A side-by-side comparison drawn from each city's tree-protection ordinance. For the underlying full ordinance text, see the Bend ordinance page or the Gresham ordinance page.
Side-by-side comparison
| Field | Bend | Gresham |
|---|---|---|
| Protected tree definition | Protected tree: 8 inches DBH or greater for most species; juniper and native species have separate criteria. Tree retention required during development. | Significant tree: 6 inches DBH or greater on development sites. Tree preservation standards apply during land use review. Heritage trees designated separately. |
| Heritage / landmark trees | Not documented | Heritage trees designated for exceptional size, species, age, or historical significance. |
| Who can apply | Property owner or authorized agent with arborist report | Property owner or authorized agent with arborist report |
| Replacement ratio | Not documented | Inch-for-inch caliper mitigation |
| Replacement details | Not documented | On-site replacement preferred; fee-in-lieu to tree fund when infeasible. |
| Typical processing time | Not documented | 4-6 weeks |
| Permit fee | Not documented | Not documented |
| Permitting department | Community Development Department | Urban Design and Planning Department |
| Municipal code | View ordinance → | View ordinance → |
How they differ
- Which city has stricter heritage tree protections, Bend or Gresham?
- Gresham has a heritage tree program (Heritage trees designated for exceptional size, species, age, or historical significance.). Bend does not document a heritage / landmark designation in its ordinance, so heritage protections are stricter in Gresham.
- Where is a tree removal permit processed faster, Bend or Gresham?
- Gresham publishes a typical processing time of 4-6 weeks. Bend does not publish a typical processing time, so confirm the current turnaround directly with Bend's permitting department.
- Where are tree replacement obligations heavier, Bend or Gresham?
- Gresham requires a replacement ratio of Inch-for-inch caliper mitigation. Bend does not document a fixed replacement ratio in its ordinance, so replacement obligations are typically heavier in Gresham.
Bend next steps
Gresham next steps
Filing in Bend or Gresham?
Capture an ISA TRAQ Level 1, 2, or 3 assessment in the field and export a municipality-ready PDF that fits each city's required report sections. Free, no account required.
Start a TRAQ assessment