How to apply for a tree removal permit in Lacey, Washington

A 5-step walkthrough drawn from Lacey's tree-protection ordinance. For the underlying DBH thresholds, protected-species list, and full fee schedule, see the city ordinance page.

Expected processing time: 4-6 weeks. Plan removal timing accordingly — emergency-tree provisions may differ.

  1. 1

    Determine if your tree is regulated

    Trees at or above 6" DBH (diameter at breast height) are regulated. Significant tree: 6+ inches DBH. Tree retention required during development per zoning code. Landmark trees designated separately for exceptional size or significance. Heritage / landmark designation: Landmark trees designated for exceptional size, species, age, or historical significance.

  2. 2

    Determine who must apply

    Eligible applicants in Lacey: Property owner or authorized agent with arborist report.

  3. 3

    Prepare your assessment report

    Your assessment report must include: Tree inventory with DBH, species, condition, retention plan, replacement plan. Required certifications: ISA Certified Arborist.

  4. 4

    Submit to the permitting department

    Submit your application and assessment report to Community and Economic Development. Typical processing time: 4-6 weeks. Reference the full ordinance at https://www.codepublishing.com/WA/Lacey/.

    View the full Lacey ordinance

  5. 5

    Plan for replacement obligations

    Replacement ratio: Based on retention percentage and tree unit standard. On-site replacement preferred; fee-in-lieu when infeasible.

Where to file

Community and Economic Development

(360) 491-5642

Other Washington permit walkthroughs

See Washington replacement obligations compared — how Lacey's replacement ratio ranks against the rest of the state.

See Washington heritage criteria compared — how Lacey's designation rules stack against the rest of the state.

Need an arborist report for your Lacey permit?

Capture an ISA TRAQ Level 1, 2, or 3 assessment in the field and export a municipality-ready PDF that fits Lacey's required report sections. Free, no account required.

Start a TRAQ assessment