How to apply for a tree removal permit in Round Rock, Texas

A 5-step walkthrough drawn from Round Rock's tree-protection ordinance. For the underlying DBH thresholds, protected-species list, and full fee schedule, see the city ordinance page.

Expected processing time: 4-6 weeks. Plan removal timing accordingly — emergency-tree provisions may differ.

  1. 1

    Determine if your tree is regulated

    Trees at or above 8" DBH (diameter at breast height) are regulated. Protected tree: 8 inches DBH or greater on development sites. Heritage trees (24+ inches DBH) receive enhanced protection. Heritage / landmark designation: Heritage trees: 24+ inches DBH of qualifying native Central Texas species (live oak, post oak, cedar elm, pecan, bald cypress, bur oak).

  2. 2

    Determine who must apply

    Eligible applicants in Round Rock: Property owner or authorized agent with ISA Certified Arborist assessment.

  3. 3

    Prepare your assessment report

    Your assessment report must include: Tree survey with species, DBH, condition, canopy dripline, retention plan, mitigation calculation. Required certifications: ISA Certified Arborist.

  4. 4

    Submit to the permitting department

    Submit your application and assessment report to Planning and Development Services. Typical processing time: 4-6 weeks. Reference the full ordinance at https://www.roundrocktexas.gov/departments/planning-and-development-services.

    View the full Round Rock ordinance

  5. 5

    Plan for replacement obligations

    Replacement ratio: Caliper-inch mitigation with enhanced ratio for heritage trees. On-site replacement preferred; payment to Tree Mitigation Fund when infeasible.

Where to file

Planning and Development Services

(512) 218-5428

Other Texas permit walkthroughs

See Texas replacement obligations compared — how Round Rock's replacement ratio ranks against the rest of the state.

See Texas heritage criteria compared — how Round Rock's designation rules stack against the rest of the state.

Need an arborist report for your Round Rock permit?

Capture an ISA TRAQ Level 1, 2, or 3 assessment in the field and export a municipality-ready PDF that fits Round Rock's required report sections. Free, no account required.

Start a TRAQ assessment