How to apply for a tree removal permit in Campbell, California

A 5-step walkthrough drawn from Campbell's tree-protection ordinance. For the underlying DBH thresholds, protected-species list, and full fee schedule, see the city ordinance page.

Expected processing time: 4-6 weeks. Plan removal timing accordingly — emergency-tree provisions may differ.

  1. 1

    Determine if your tree is regulated

    Trees at or above 12" DBH (diameter at breast height) are regulated. Protected Tree: any tree with 38-inch circumference (~12 inches diameter) or greater at 4.5 feet above grade; all trees on public property and street trees regardless of size; Heritage/Significant Trees designated by Council. Heritage / landmark designation: Significant/Heritage Trees designated by City Council for exceptional size, age, species rarity, historical association, or community value.

  2. 2

    Determine who must apply

    Eligible applicants in Campbell: Property owner or authorized agent with ISA Certified Arborist report.

  3. 3

    Prepare your assessment report

    Your assessment report must include: Tree inventory with species, DBH, canopy dripline, condition/health assessment, retention/removal status, replacement plan. Required certifications: ISA Certified Arborist.

  4. 4

    Submit to the permitting department

    Submit your application and assessment report to Community Development Department. Typical processing time: 4-6 weeks. Reference the full ordinance at https://www.codepublishing.com/CA/Campbell/html/Campbell21/Campbell2132.html.

    View the full Campbell ordinance

  5. 5

    Plan for replacement obligations

    Replacement ratio: 1:1 minimum; 2:1 or higher for Heritage/Significant Trees. 15-gallon or 24-inch box replacement from approved species list. In-lieu fees to the Tree Preservation Fund when on-site replanting is infeasible.

Where to file

Community Development Department

(408) 866-2140

Other California permit walkthroughs

See California replacement obligations compared — how Campbell's replacement ratio ranks against the rest of the state.

See California heritage criteria compared — how Campbell's designation rules stack against the rest of the state.

Need an arborist report for your Campbell permit?

Capture an ISA TRAQ Level 1, 2, or 3 assessment in the field and export a municipality-ready PDF that fits Campbell's required report sections. Free, no account required.

Start a TRAQ assessment